15B – warewashing facilities: installed, maintained, used; test strips
511-6-1.05(3)(h),(i),(j) – temperature measuring device, manual warewashing; sanitizing solutions, testing device (pf)
Points: 1
Corrected during inspection?: No
Repeat: No
Inspector Notes: No chemical test kit provided when using chemical sanitizer at three-compartment sink/warewashing machine.
17C – physical facilities installed, maintained, and clean
511-6-1.07(2)(b) – floor, walls, & ceiling, cleanability; utility lines (c)
Points: 1
Corrected during inspection?: No
Repeat: No
Inspector Notes: WALK IN COOLER FLOOR IS PLYWOOD, NEEDS TO BE REPAINTED OR SEALED, BROKEN KITCHEN TILE NEAR FLOOR DRAIN NEED TO BE REPLACED


