Quality Inn Tourist Accommodation Report

Violations


16 – toilet/lavatory/bathing facility fixtures and rooms clean and maintained; properly lighted, clearly marked, proper signage, and all in good repair

511-6-2-.08(4) – toilet facilities-cleaning and maintenance

Points: 2

Corrected during inspection?: No

Repeat: No

Inspector Notes Observed damaged flaking ceiling in Room 313 and Room 102. Room 102 is under construction. Operator is to repair and paint damaged ceiling with 30 days.

24 – openings to outside and physical facilities protected by tight-fitting doors, screening, or other means

511-6-2-.13(3) – insect and rodent control-openings

Points: 2

Corrected during inspection?: No

Repeat: No

Inspector Notes Observed entry doors of Rooms 215 and 307 not tight fitting to ensure tight sealed rooms. Weather stripping is worn causing door not to have tight fit to frame. Operator is to replace worn weather stripping on door within 30 days.

27 – all furniture, waste receptacles, draperies, carpets; clean, and in good repair, considered the property of and furnished by the tourist accommodation

511-6-2-.14(5) – condition of furnishings

Points: 4

Corrected during inspection?: No

Repeat: No

Inspector Notes Observed stained cloth chairs in Rooms 215 and 313. Chairs to be cleaned within 5 days.

32 – separate, structurally sound, clean, and in good repair: dryers vented and adequate lighting

Points: 1

Corrected during inspection?: No

Repeat: No

Inspector Notes Observed damaged ceiling in laundry room. Flaking paint on ceiling. PIC stated she will discuss with owner regarding repair of laundry room ceiling. PIC or owner is to let EH know the timeframe for ceiling repair not to exceed 30 days from this inspection. PIC or owner to let EH know by COB 09/28/20.


Leave a Reply

Your email address will not be published. Required fields are marked *