Planning Department Fee Schedule

Proposed Subdivision Application Fees
Proposed
Administrative $125 + $10 per lot + $8 recording fee
Topo Variance $25
Exempt $100 + $8 Recording Fee
Preliminary $150 + $15 Per Lot
Final $100 + $10 Per Lot + $8 Recording Fee
Combined Pre/Final Preliminary and Final Fees Combined (less 10% discount)

*$25 Processing Fee Added To Each Subdivision
**Topo Variance Is Added to Each Plat That Is Exempted From Topos


PROPOSED FEE INCREASE
$25 Processing Fee Plus
Paved Road Bond $15 per lineal foot
Driveway Permits $20

LOT FEES FOR SUBDIVISIONS
Administrative Subdivisions See Attached
Waiver - Topographic & Soil Survey See Attached
All Other Subdivisions
Preliminary See Attached
Final See Attached

VARIANCE REQUEST
All Variance Requests $100, plus $50 for ad; if needed

ROAD SIGNS
Sign Post, Sign, Labor to Install $50

FEES FOR RECORDING RESTRICTIVE COVENANTS
First page of covenants $10
Each additional pages $2

SIGN FEES
First $1,000 of a sign's value $60
Each additional $1,000 $10
Electrical permit fee is separate

NEW CONSTRUCTION AND ADDITIONS
Residential (heated) $.26/sq ft; or $30 min.
Residential (unheated)* $.19/sq ft; or $30 min.
Commercial $.25/sq ft; or $30 min.
Industrial $.26/sq ft; or $30 min.
Storage $.19/sq ft; or $30 min.

BUILDING PLAN REVIEW FEE 50% of the building permit fee

BUILDING CODE COMPLIANCE INSPECTION $100

BUILDING REPAIRS AND REMODELING
Up to $5000 $40
$5000 to $10000 $80
$10000 to 15000 $120
$15000.01 to $20000 $160
$20000 to $25000 $200
$25000 to $30000 $240
$30000.01 to $35000 $280
$35000.01 to $40000 $320
$40000.01 to $45000 $360
$45000.01 to $50000 $400
$50000.01 to $55000 $440
$55000.01 to $60000 $480
$60000.01 to $65000 $520
$65000.01 to $70000 $560
$70000.01 to $75000 $600
$75000.01 to $100000 $640
$100,000 to Over For the First $100,000 $680
Add for Each Additional $1000 $6

MANUFACTURED HOME
Set Up
Singlewide $75
Doublewide $125
Triplewide $175
Electric $30
Conditioned Air $30
Gas $30

HOUSE MOVING
Move Existing Structure $100
Additional Electrical, Plumbing, Gas, Conditioned Air Permits Required for Resetting House.

DEMOLITION
Demolition of Existing Structure $0 (Must pay processing fee)

ELECTRICAL
Minimum Permit Fee A basic fee of $30, or the following, whichever is greater
Or per each:
Outlet/Switches/Fixtures $0.40
Appliance $0.40
Smoke Detectors $0.40
Exhaust Fans $0.40
Heat Strips/Air Handler $0.40
Air Conditioner $6
Well Pump $6

Motor:
5 hp or less $6
Over 5 hp thru 25 hp $9
Over 25 hp thru lOOhp $15
Over 100 hp $30

Generators:
600 volts or less, not over 1 kw $9
600 volts or less, over 1 kw $15
Over 600 volts $40

Services:
Temporary Service Only $30
Temporary Construction Services $8
200 amps or less
199 amps, or less $8
200 amps, but less than 600 amps
200 amps to 599 amps $15
600 amps to 800 amps
600 amps to 799 amps $23
For each additional 100 amps over 800
For each additional 100 amps 800 over $3

Transformers:
Not Exceeding 600 Volts $8
Exceeding 600 Volts $15

PLUMBING
Minimum Fee $30
Or per each Fixture and Drain $3
Minimum Fee or Fixture Count-Whichever is Greater

MECHANICAL
Minimum Fee $30
Or per each:
Air Conditioning Compressors per ton $8
Heating Equipment per 50,000 BTU $8
Not included in above per $1000 valuation
(Use Valuation when tons or BTU cannot be calculated)
Minimum Fee or Per Each— Whichever is Greater $8

GAS Minimum Permit $30
Or per each:
Tank Set $8
Connection to Gas System $3

RE-INSPECTIONS $40

CONTRACTOR REGISTRATION FEE
Local Contractors $50
Non-Local Contractors $0